Beginning in mid-July 2020, EPA will start the Red and Bonita Mine bulkhead test, the agency has announced.
The Red and Bonita bulkhead was constructed in 2015 by Mining & Environmental Services to control the adit drainage from the mine workings behind the bulkhead. Running through the bulkhead is an 8-inch diameter pipe that has been kept open since the construction.
This allows for…